Modeling and Simulation of Energy Storage & Energy Management in PV BESS Microgrid
Implementation Plan:
Step 1: Initially, we will construct the Simulink model of a PV-Battery (PV-BESS) microgrid system with DC bus interconnection.
Step 2: Then, we implement multi-objective optimization (MOGWO algorithm) to optimize PV and battery parameters using the LCOE objective.
Step 3: Next, we collect solar generation data, load profiles , battery data and energy flow data.
Step 4: Next, we analyze battery excess energy generation, deficit energy, and energy transfer based on collected data.
Step 5: Next, we analyze excess energy sharing/trading based on collected simulated data.
Step 6: Finally, we plot performance metrics vs. Time:
6.1: Time vs. Solar PV Power (kW)
6.2: Time vs. Load Demand (kW)
6.3: Time vs. State of Charge (SoC)
6.4: Time vs. Excess Energy (kW)
6.5: Time vs. Deficit Energy (kW)
Software Requirements:
1. Development Tool: MATLAB R2023a/Simulink or above
2. Operating System: Windows-10 (64-bit) or above
Note:
1) If the proposed plan does not fully align with your requirements, please provide all necessary details—including steps, parameters, models, and expected outcomes—in advance. Kindly ensure that any missing configurations or specifications are clearly outlined in the plan before confirming.
2) If there’s no built-in solution for what the project needs, we can always turn to reference models, customize our own, different math models or write the code ourselves to fulfil the process.
3) If the plan satisfies your requirement, Please confirm with us.
4) Project based on Simulation only.